Start the engine. Raise the lift arms and install an approved lift arm support device. (See Installing Lift Arm
Support Device on Page 10-20-1.)
Stop the engine.
Raise the operator cab. (See Raising The Operator Cab on Page 10-30-1.)
Disconnect solenoid connector harness (Item 1) [Figure 20-90-5].
Disconnect tubelines (Item 1) [Figure 20-90-6] from the B, C, and D port.
Disconnect tubeline (Item 1) [Figure 20-90-7] at tee fitting.
This line is connected to A port on bucket position valve.
Remove bucket position valve mounting bolts (Item 1) [Figure 20-90-8]. Remove valve from loader.